- Installation of control room equipment, such as control panels, console for monitors, monitors, cabinets, printers, telecommunication systems, etc.
- Installation of Central Control Room Equipment, such as Marshalling Cabinets, Cabinets, Distribution Boards,
- Installation of Fire and Gas equipment such as smoke detectors, gas detectors, warning devices, Sounders & Beacons.
- Installation of Cables / Multi-Cables.
- Installation of any type of support for equipment (frames or others types as required), cable , trays and ladders, conduits, etc…
- Wiring and connections
- Check the continuity signals and verify the polarity between transmitters and sensors with control room through junction box.
- Check the setting for control valves and check its feedback signals to control room.
- Check the setting of safety relief valves according to the data sheets and process documents.
- Check the instrumentation and control system for trace heating system.
- Inspect the control loop between site and DCS.
- Inspect the functional control for the local panels and/or main interlock panels.
- Pre commissioning and Startup.
1. Installation of instruments in buildings
Integrity Control Loops Checking from Field to Control System (PLC/DCS) including:
- Continuity and Shielding.
- Simulation/Sourcing of 4 to 20 mA from Field devices to Control System and from Control System to Final Control Element(Control Valves, Shutdown Valves).
- Cause and Effects Checking
- Logic Testing from Control System.
- Testing of Alarms configured in the System against
- Instrument Parameters.
- Troubleshooting of Loops from Field to Control System.
- Testing and function testing of instruments on Human Machine Interface (HMI).
- Online Configuration through HART for SMART & Foundation Fieldbus Devices FF.
- Testing of Emergency Shutdown System (ESD) Loops
2. Test and Commissioning
- Commissioning assistance for Oilfields, Gas Plants, Early Production Facilities (EPFs), Central Processing Facility (CPF).
- Prepare Loop Packages for all Field Instrumentation and submit to the client for checking and testing including the following forms;
– Loop Drawing for each Loop
– Meggering and Continuity Testing Report
– Impulse Lines Pressure Testing Report.
– Calibration Report